    Crew installing cable ducts in a trench on Brougham Street
    previous next
    Once the cable ducts are installed in the trench, we lay mag slab over the top. The mag slab protects the cable ducts (and the cable inside the ducts) from mechanical damage such as excavation in the road at a later date. Once the mag slab is laid, the trench is backfilled in layers of compacted gravel and then the final asphalt surface is laid.
    Milling the road's surface
    An installed cable duct
    Crew installing cable ducts in a trench on Brougham Street
    Laying new cables
    New 66kV power cable