    Laying new cables
    previous next
    Laying new 66kV cables in a trench as part of the Marshland to Belfast cable project. The cables are being winched through the trench on rollers. The crew monitor the cable lay to ensure that the cable does not get damaged.
    Milling the road's surface
    An installed cable duct
    Crew installing cable ducts in a trench on Brougham Street
    Laying new cables
    New 66kV power cable