• Skip to main content
  • Jump to navigation
  • Search

IE10 and below are not supported.

Google Chrome Mozilla Firefox

Contact us for any help on browser support

You are here:

  • Home
  • Milton to Halswell 66kV underground power cable

Photos

Laying new cables
previous next
Laying new 66kV cables in a trench as part of the Marshland to Belfast cable project. The cables are being winched through the trench on rollers. The crew monitor the cable lay to ensure that the cable does not get damaged.
Milling the road's surface
An installed cable duct
Crew installing cable ducts in a trench on Brougham Street
Laying new cables
New 66kV power cable