Contractor installing a new 66kV cable in an open trench

You are here:

  • Home
  • Bromley to Milton power cable

Photos

Dewatering spears installed in St Johns Street
previous next
Where the ground water table is near the surface we need to dewater before be dig. We dewater using spears inserted into the ground. A pump then creates a vacuum that draws the water to a pipe at the surface that is connected to the spears. The ground water is then discharged to the local stormwater network.
Milling the road's surface
An installed cable duct
Crew installing cable ducts in a trench on Brougham Street
Laying new cables
New 66kV power cable